Archive for April 2016

What happened these last years?

Time passes quickly!

It has been a bit quiet here the last 3 years, but the project has been running along even if it has been a bit slower than planned.

Since august 2012 Nómada came back to the water, the mast was stepped, some painting was done, building of interior, installation of a heating system, building a diesel tank, building a refrigerator and freezer, building a holding tank, installing electrical system etc. etc…..

Here are some photos of the progress.

Until next time 🙂

 

 

Categories
Slideshow